Friday 14 March 2014

week 5 - flow chart of the project


based on the flow chart, the hybrid system will start to operate once the switch is on. All renewable energy source will be collected and in this case solar, wind and sea waves. when the power is collected it will go to the controller. In this project the controller will detect the highest source of power produced, it could be solar, wind or sea waves based on the current condition. then, the power will be distribute by the controller  from the highest source to the engine.

No comments:

Post a Comment